About admin

This author has not yet filled in any details.
So far admin has created 13 blog entries.

Forterra Acquires Bio Clean Environmental Services and Modular Wetland Systems

FOR IMMEDIATE RELEASE Forterra Acquires Bio Clean Environmental Services and Modular Wetland Systems IRVING, Texas (August 3, 2016) – Forterra, a manufacturer of water and drainage pipe and products, today announced [Read more]

Manchester Retrofit Community Park

PROJECT: Manchester, Washington Stormwater Retrofit Community Park LOCATION: Manchester, WA PRODUCTS: Modular Wetlands' MWS Linear & Bio Clean Nutrient Separating Baffle Box (NSBB) COMPANY: Bio Clean and Modular Wetlands Introduction Kitsap County [Read more]

Kraken Filter Is NJDEP On-line Approved

NJDEP Verification On-line Approval The State of New Jersey, Department of Environmental Protection "This is an updated certification for the Kraken Stormwater Filtration System (“Kraken”) that allows for use of [Read more]

Pacific Highlands Ranch Residential Stormwater Treatment

"Quantity Meets Lavish and Luxury." PROJECT: Pacific Highlands Ranch Residential Stormwater Treatment LOCATION: North County San Diego PRODUCTS: Modular Wetlands' MWS Linear, Bio Clean NSBB Hydrodynamic Separator coupled with a [Read more]

Kraken Filter Is NJDEP Certified

NJDEP Certification The State of New Jersey, Department of Environmental Protection "The NJDEP certifies the use of the Kraken Stormwater Filtration System by BioClean Environmental Service, Inc., at a [Read more]

Kraken Filter Receives NJCAT Verification

HOW DID THE KRAKEN PERFORM? The Kraken membrane filter is a 'verified' success. This stormwater system is the newest technology to join the Bio Clean line of products [Read more]

Otay Tijuana Airport, Stormwater Project

Otay Border Crossing Cross Border Xpress Products: Water Polishers & MWS Linears Introduction Set to open November 2015, the facility and bridge connecting California’s Otay Mesa to Mexico’s Tijuana [Read more]

Solana Beach Elementary, Stormwater Project

Balfour Beatty Construction, Bio Clean Combine Resources To Provide Cost-Effective School Solution Initially established in the 1930’s and consisting of one classroom on five acres of Old Solana property, [Read more]

Sunnyside Lake Tahoe, Stormwater Project

West Sunnyside Erosion Control Nutrient Separating Baffle Box Restoring Clarity to Lake Tahoe The Situation Lake Tahoe, CA – Lake Tahoe Basin was geologically formed about two million years [Read more]

Valley Center, Stormwater Project

In December 2005, the County of San Diego Department of Public Works started Phase 2 of the Valley Center Road Improvement Project. The project entails the construction of four [Read more]

Load More Posts